Smartroad GotlandSep 17, 20221 min readSuccessful upgrade of 400 metersThe upgrade of the electric road has been done along the high speed section, in the southerly direction on a total stretch of 400 meters. The system has been tested with good results.
The upgrade of the electric road has been done along the high speed section, in the southerly direction on a total stretch of 400 meters. The system has been tested with good results.
Comments